Smart Unloading System
An automatic slab stacker installed on the discharge side of the saw: cut slabs are pushed off, picked up by vacuum cups, transferred, stacked and counted automatically, at a constant 1 slab/min, 24 hours a day, with 1 operator for 5 machines.

The faster you cut, the harder the stacking:
unloading is the most painful step in a stone plant
The Smart Unloading System hands this most exhausting, most dangerous and most error-prone step to a manipulator: workers never touch the slab, the cycle is constant, counting is automatic, working in sync with the saw to complete the whole unloading process, for granite, marble, limestone and engineered stone alike.
A Slab's Fully Automatic Journey
Five actions run in a loop with no human intervention, and they are also the working standard checked item by item at acceptance.
The saw cuts to depth, leaving a precise margin
Working with the saw, slabs are cut with the depth controlled precisely at about 1/4 of slab thickness where separation is needed, leaving a break path for mechanical separation without cutting through or chipping the face.
Pneumatic push-off · gently parts the slab along the kerf
The push-off mechanism gently separates the pieces along the pre-cut kerf, replacing manual prying with even force and controlled direction that protects edges and faces.
Vacuum-cup gantry manipulator pick-up
The gantry manipulator positions itself automatically and the vacuum cups adjust suction to the surface, lifting each slab smoothly; granite, marble, limestone and engineered stone surfaces are all gripped reliably.
Automatic transfer · stacking onto a stack or pallet
The manipulator transfers the slab to the stacking position and stacks it neatly by the set rule; stacking height and position are adjustable in the PLC, supporting wooden racks, pallets and direct stacking.
Automatic counting · count sheet generated in step
Each stacked slab is counted automatically and the count sheet is generated per batch: how many slabs cut today, how many per stack, no more hand counting when reconciling with customers.
Four Systems, Each With Its Job
Vacuum-cup gantry manipulator
A rigid gantry structure with a long stroke covering the saw's discharge area and the stacking area; a multi-cup layout adapts to the slab face, with adjustable suction and smooth motion.
Pneumatic push-off mechanism
Gently parts slabs along the pre-cut kerf, with force and stroke controlled by the PLC to suit different thicknesses, eliminating the edge damage caused by manual prying.
PLC control system
Linked to the saw's signals to coordinate the cycle automatically; parameters (slab length, stacking layers, cycle) are adjustable on the panel, with fault self-diagnosis and on-screen prompts.
Automatic counting & count sheet system
Every unloading count becomes a ledger entry and count sheets are generated automatically; data can be exported to a cloud dashboard / AI stock-in sheet (optional), keeping accounts crystal clear.
Specifications: Two Models, Chosen by Slab Length
Model 1: WF-ST2.2 suits regular large-slab cutting; Model 2: WF-ST3.0 suits 3-meter-class long slabs and large formats.
| Parameter | Model 1: WF-ST2.2 For regular slabs | Model 2: WF-ST3.0 For extra-long slabs |
|---|---|---|
| Slab length | ≤ 2.2 m | ≤ 3.0 m |
| Single-slab weight | ≤ 300 kg | ≤ 600 kg |
| Installed power | 18 kW | 22 kW |
| Machine height | approx. 2.5 m | approx. 2.5 m |
| Footprint | approx. 6.0 × 4.3 m | approx. 6.8 × 5.1 m |
| Unloading cycle | Constant 1 slab/min | Constant 1 slab/min |
| Daily output (standard conditions) | approx. 1,600 m²/day | approx. 2,600 m²/day |
| Continuous operation | 24-hour continuous production | 24-hour continuous production |
| Staffing | 1 operator for 5 machines | 1 operator for 5 machines |
| Control | PLC auto-cycle · linked to the saw | PLC auto-cycle · linked to the saw |
| Handling | Vacuum-cup gantry manipulator + pneumatic push-off | |
| Materials | Granite / marble / limestone / engineered stone | |
Site requirements: three-phase power and compressed air; a clear workshop height of ≥3 m is generally sufficient (machine height about 2.5 m). Before the engineer's visit, please provide workshop floor dimensions, door opening size, saw model and a photo of the discharge side.
Unloading: Manual vs Smart Unloading System
| Item | Manual stacking | Smart Unloading System |
|---|---|---|
| Stacking method | Bending and lifting, hard physical work | Automatic stacking by vacuum-cup manipulator |
| Cycle | Fluctuates with fatigue, slower as the shift goes on | Constant 1 slab/min, 24h non-stop |
| Labor input | 2–3 workers per shift for stacking | 1 operator supervises 5 machines at once |
| Injury risk | Hotspot for crush and strain injuries | Workers never touch the slab, zero lifting in operation |
| Damage control | Knocks are unavoidable, breakage disputes are common | Damage-free cups + smooth motion, damage is traceable |
| Counting & reconciliation | Manual counting, easy to miss or miscount | Automatic counting, count sheets generated automatically |
| Long-term cost | Wages rise every year, and hiring is hard | One-off investment, low electricity cost, no labor-cost growth for years |
Based on typical labor costs in stone regions, the equipment usually pays for itself in about a year through labor savings (indicative; an engineer can prepare a free calculation for your plant).
Six Advantages · Why Choose It
Industry-leading equipment
A mature model refined for real production conditions, among the most advanced in China and ready for volume delivery, not a lab prototype.
Fully automatic
A constant unloading cycle and 24h operation; capacity does not fluctuate with shifts or stamina.
Zero injury risk
Workers never touch the slab and nothing is lifted during operation, so injury risk and labor disputes both drop to zero.
Digital management
Automatic counting and count sheets; output data can feed a cloud dashboard, keeping accounts transparent.
High cost-performance
For the same functionality and precision, the investment is about one third of comparable Italian imports, with after-sales service and parts based in China for faster response.
Flexible fit
Works with granite / marble / limestone / engineered stone; slab length and stacking rules customized per plant.
Three Options, Added as Needed
◆Smart material-change platform
Automatic hand-off for frequent material changes shortens the gap so 24h production truly never stops.
◆Cloud data dashboard
Output, cycle time and equipment status on screen in real time; check workshop data from your phone anytime.
◆AI auto stock-in sheet
Unloading counts generate stock-in sheets directly, replacing manual count records with clear reconciliation.
◆Warranty & support (standard)
Installation and commissioning + operator training + 12-month warranty + lifetime technical support + 48-hour response, all written into the contract.
FAQ
Find the Model That Fits Your Workshop
Send your slab specifications and workshop photos; an engineer confirms the model and issues a quote the same day.
