Hotline 4008-119-722 bjwfzg@163.com Mon–Sat 8:30–18:00

Cases & Site Footage

FIELD CASES & PHOTOS

Installation, commissioning and operation of the Smart Unloading System and automated lines at stone-region plants. By commercial agreement, customer names and business data are not shown; to see the real thing running, book a site visit.

VIDEOS

Operation Videos

Clips of the equipment in operation (footage can be replaced as needed).

Unloading system video cover
VideoSmart Unloading System · On site
Automated line video cover
VideoAutomated line · Running clip
WAYS TO WORK

Three Common Ways to Work With Us

WAY 01 · Retrofit an existing line

Add an unloading system to your current workshop

Saws and workshop stay as they are; the unloading system is added on the discharge side, the fastest way to see results. Survey, customize, install; retrofit and commissioning typically take 3–7 days.

WAY 02 · Build a new line

Design a new plant around an automated line

Planning from the workshop layout up: loading, cutting, sorting, washing and stacking designed as a whole, with digital interfaces reserved, for a minimal-staff line built in one go.

WAY 03 · Phased implementation

Single machine first, then the line, then digital

Invest capital and manpower step by step: phase one, the unloading system; phase two, once proven, the upstream automation; phase three, the digital dashboard. Each phase delivers on its own.

1 slab/minA constant cycle, stability customers can see
12 monthsof warranty + lifetime technical support written into the contract
48 hoursto respond to service requests, parts stocked in advance

Want to See the Equipment Running First?

Book a visit to a running customer site or our production base. Seeing is believing.