Add an unloading system to your current workshop
Saws and workshop stay as they are; the unloading system is added on the discharge side, the fastest way to see results. Survey, customize, install; retrofit and commissioning typically take 3–7 days.
Installation, commissioning and operation of the Smart Unloading System and automated lines at stone-region plants. By commercial agreement, customer names and business data are not shown; to see the real thing running, book a site visit.
Material comes from delivery sites and customer lines, with no special effects.

Engineers installing the manipulator and control system on site.

A vacuum-cup manipulator stacking automatically.

The unloading system takes over automatically as slabs leave the saw.

Slabs transferred and stacked onto the pallet.

Multiple stations linked for continuous production.

Trial-run acceptance, checking cycle time and count sheets.
Want to know the industry and conditions behind these images? Call 4008-119-722, and an engineer will walk you through similar applications in your sector.
Clips of the equipment in operation (footage can be replaced as needed).
Saws and workshop stay as they are; the unloading system is added on the discharge side, the fastest way to see results. Survey, customize, install; retrofit and commissioning typically take 3–7 days.
Planning from the workshop layout up: loading, cutting, sorting, washing and stacking designed as a whole, with digital interfaces reserved, for a minimal-staff line built in one go.
Invest capital and manpower step by step: phase one, the unloading system; phase two, once proven, the upstream automation; phase three, the digital dashboard. Each phase delivers on its own.
Book a visit to a running customer site or our production base. Seeing is believing.