Add an unloading system to your current workshop
Saws and workshop stay as they are; the unloading system is added on the discharge side, the fastest way to see results. Survey, customize, install; retrofit and commissioning typically take 3–7 days.
Installation, commissioning and operation of the Smart Unloading System and automated lines at granite-processing plants. At our customers' request, names and production data are not shown; to see the real thing running, book a site visit.
This footage comes from delivery sites and customer lines, with no special effects.

Engineers installing the manipulator and control system on site.

A vacuum-cup manipulator stacking automatically.

The unloading system takes over automatically as slabs leave the saw.

Slabs transferred and stacked onto the pallet.

Multiple stations linked for continuous production.

Trial-run acceptance, checking cycle time and count sheets.
Want to know the industry and conditions behind these images? Call 4008-119-722, and an engineer will walk you through similar applications in your sector.
Clips of the equipment in operation.
Saws and workshop stay as they are; the unloading system is added on the discharge side, the fastest way to see results. Survey, customize, install; retrofit and commissioning typically take 3–7 days.
Planning from the workshop layout up: loading, cutting, sorting, washing and stacking designed as a whole, with digital interfaces reserved, for a minimal-staff line built in one go.
Invest capital and manpower step by step: phase one, the unloading system; phase two, once proven, the upstream automation; phase three, the digital dashboard. Each phase delivers on its own.
Book a visit to a running customer site or our production base. Seeing is believing.